• Shaanxi CHENGDA Industry Furnace MAKE Co., Ltd.
    Syed Rashid Ahmed Butt
    Shaanxi Chengda Industrial Furnace Co., Ltd. completed the commissioning of electric arc furnace, the workers carefully cooperated with Chengda engineers to learn and operate the equipment, showing the deep friendship and excellent cooperation between the people of China and Pakistan.
  • Shaanxi CHENGDA Industry Furnace MAKE Co., Ltd.
    Aboubacar
    After more than 1 month of intense production and debugging, 2 sets of heat exchange flue gas settling chamber equipment has been successfully put into operation ~ All the personnel involved in the project have worked hard! ~
  • Shaanxi CHENGDA Industry Furnace MAKE Co., Ltd.
    Ji-hwan
    【 Warm congratulations 】 Shaanxi Chengda Industrial Furnace Manufacturing Company in South Korea, North Chungcheong County precious metal smelting furnace equipment installation and careful manufacturing and strict commissioning, looking forward to the future in more fields to achieve mutually beneficial win-win cooperation!
Contact Person : Du
Phone Number :  13991381852

600000 t/y Ferronickel Submerged Arc Furnace for Laterite Nickel Ore Smelting Plant

Place of Origin China
Brand Name Chengda
Certification ISO 9001
Model Number CD-NI-600K
Minimum Order Quantity 1 set
Price Negotiable
Packaging Details Export packing, sea freight
Delivery Time 120-180 days
Payment Terms T/T, L/C
Supply Ability 6 sets per year
Product Details
Model Number CD-NI-600K Rated Power Customized
Furnace Shell Size Customized Melting Temperature 1450-1550°C
Annual Output 600,000 T/y Cooling Water Cooled Hood
Highlight

Ferronickel submerged arc furnace

,

Laterite nickel ore smelting plant

,

Ferroalloy refining equipment

Leave a Message
Product Description

Product Overview

This ferronickel submerged arc furnace line is engineered for laterite ore smelting with an annual capacity of 600,000 tonnes. The reference plant operates with a complete charging, dust collection, water-cooled flue and tapping system, all supplied as one integrated package.

Technical Parameters

ItemValue
Smelting dutyFerronickel
Annual output600,000 t/y
CoolingWater-cooled hood and flue duct
ChargingSkip hoist with batching system

Process Description

Laterite ore, reductant and fluxes are proportioned, lifted to the charging bins and fed into the furnace through roof chutes. Arc and resistance heat reduce the ore, and ferronickel is tapped at intervals into ladles for casting. Off-gas is captured by the water-cooled hood and routed to the bag filter.

Key Features

  • Integrated charging, tapping, slag and gas handling systems
  • Water-cooled hood and flue designed for high dust loading
  • Balanced short network for stable three-phase power
  • Hydraulic electrode slipping with reliable brake units

Scope of Delivery

Furnace proper, charging and batching system, water-cooled hood and flue, dust collection interface, tapping equipment, electrical control, drawings, erection supervision and commissioning.