Syed Rashid Ahmed ButtShaanxi Chengda Industrial Furnace Co., Ltd. completed the commissioning of electric arc furnace, the workers carefully cooperated with Chengda engineers to learn and operate the equipment, showing the deep friendship and excellent cooperation between the people of China and Pakistan. -
AboubacarAfter more than 1 month of intense production and debugging, 2 sets of heat exchange flue gas settling chamber equipment has been successfully put into operation ~ All the personnel involved in the project have worked hard! ~ -
Ji-hwan【 Warm congratulations 】 Shaanxi Chengda Industrial Furnace Manufacturing Company in South Korea, North Chungcheong County precious metal smelting furnace equipment installation and careful manufacturing and strict commissioning, looking forward to the future in more fields to achieve mutually beneficial win-win cooperation!
3000kVA Industrial Copper Smelting Electric Furnace for Secondary Copper Scrap Refining Line
| Model Number | CD-CU-3000 | Rated Power | 3000kVA |
|---|---|---|---|
| Furnace Shell Size | Customized | Melting Temperature | 1200-1300°C |
| Smelting Duty | Copper And Copper Alloy | Charge | Scrap And Secondary Materials |
| Highlight | 3000kVA copper smelting furnace,industrial copper scrap refining line,ferroalloy refining equipment |
||
Product Overview
The 3000kVA copper smelting electric furnace is built for plants processing copper-bearing secondary materials and scrap. It delivers stable bath temperature, good slag separation and repeatable tapping, and has been supplied as a complete package with installation, commissioning and operator training.
Technical Parameters
| Item | Value |
|---|---|
| Rated power | 3000kVA |
| Smelting duty | Copper and copper alloy |
| Charge | Copper scrap, secondary materials, fluxes |
| Output | Copper alloy ingot or anode |
Operation Principle
Copper scrap and fluxes are charged into the furnace and melted by arc heating. Slag is skimmed or tapped separately, and molten copper is tapped into ladles or moulds. Power input and electrode position are regulated to keep the bath within the target temperature window and to limit metal loss to slag.
Key Features
- Water-cooled wall panels at the slag line for extended campaign life
- Sealed hood with controlled off-gas extraction
- Hydraulic electrode regulation for stable arc as bath composition changes
- Refractory selection matched to copper and copper alloy chemistry
Scope of Delivery
Furnace proper, electrode system, hydraulic station, water cooling, tapping and slag handling arrangement, electrical control, drawings, commissioning and operator training.