Syed Rashid Ahmed ButtShaanxi Chengda Industrial Furnace Co., Ltd. completed the commissioning of electric arc furnace, the workers carefully cooperated with Chengda engineers to learn and operate the equipment, showing the deep friendship and excellent cooperation between the people of China and Pakistan.
-
AboubacarAfter more than 1 month of intense production and debugging, 2 sets of heat exchange flue gas settling chamber equipment has been successfully put into operation ~ All the personnel involved in the project have worked hard! ~
-
Ji-hwan【 Warm congratulations 】 Shaanxi Chengda Industrial Furnace Manufacturing Company in South Korea, North Chungcheong County precious metal smelting furnace equipment installation and careful manufacturing and strict commissioning, looking forward to the future in more fields to achieve mutually beneficial win-win cooperation!
Ferroalloy Ore Furnace (Ferrosilicon)
Place of Origin | Shaanxi, China |
---|---|
Brand Name | Shaanxi Chengda |
Certification | ISO9001 |
Model Number | Negotiate based on equipment processing capacity |
Minimum Order Quantity | 1set |
Price | The price will be negotiated based on the technical requirements and supply scope of Party A |
Packaging Details | Discuss according to the specific requirements of Party A |
Delivery Time | 2~3 months |
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Complete production supply chain, supply on time, and meet quality standards |

Contact me for free samples and coupons.
WhatsApp:0086 18588475571
WeChat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xType | New (Ferrosilicon) | Country Of Origin | Shaanxi, China |
---|---|---|---|
Highlight | Ferrosilicon Ore Furnace,Ferroalloy Ore Furnace,Ferrosilicon Ferroalloy Furnace |
Ferroalloy ore furnace (Ferrosilicon)
The production process of the equipment is shown below:
Production process description:
The loading machine is used to load the charge into the distribution bin, and the belt feeder is arranged under each bin. After it is sent to the weighing bin for batching, it is transported to the top silo platform through the large-angle belt conveyor and several movable belt conveyors, and the charge is added to the furnace through the charging device for smelting.
Ferrosilicon smelting for continuous production, about 2 hours out of iron, hot metal into the hot metal ladle, with a double hook crane poured into the ingot mold, sampling during the casting process for chemical analysis, the product after cooling into the warehouse.
Process description:
The raw material is transported by the loader to the underground receiving bin, through the motor vibration feeder, unloading into the designated weighing bin, and then through the motor vibration feeder, SL1# tape machine, (with discharge car)SL2# tape machine (large Angle), three-way feed valve to the reversible distribution bin tape machine, and then to the daily bin.
Set up 8 daily silos of 80m3, including 2 silica silos, 2 spare silos, 3 alloy coke silos and 1 iron ore pellet silos. System capacity is 200 tons/hour.