• Shaanxi CHENGDA Industry Furnace MAKE Co., Ltd.
    Syed Rashid Ahmed Butt
    Shaanxi Chengda Industrial Furnace Co., Ltd. completed the commissioning of electric arc furnace, the workers carefully cooperated with Chengda engineers to learn and operate the equipment, showing the deep friendship and excellent cooperation between the people of China and Pakistan.
  • Shaanxi CHENGDA Industry Furnace MAKE Co., Ltd.
    Aboubacar
    After more than 1 month of intense production and debugging, 2 sets of heat exchange flue gas settling chamber equipment has been successfully put into operation ~ All the personnel involved in the project have worked hard! ~
  • Shaanxi CHENGDA Industry Furnace MAKE Co., Ltd.
    Ji-hwan
    【 Warm congratulations 】 Shaanxi Chengda Industrial Furnace Manufacturing Company in South Korea, North Chungcheong County precious metal smelting furnace equipment installation and careful manufacturing and strict commissioning, looking forward to the future in more fields to achieve mutually beneficial win-win cooperation!
Contact Person : Du
Phone Number :  13991381852

s Modified Water-Cooled Flue Essential for Steelmaking

Place of Origin Shaanxi, China
Brand Name Shaanxi Chengda
Certification ISO9001
Model Number water-cooled flue
Minimum Order Quantity 1set
Price Price and specific model specifications can be agreed upon.
Packaging Details Qualified new product
Delivery Time 8-15work days
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 2set per month

Contact me for free samples and coupons.

WhatsApp:0086 18588475571

WeChat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Material Steel Technical Features Heat Dissipation Fins Are Installed On The Outer Wall Of The Pipeline
Country Of Origin Shaanxi, China Effect Steelmaking Equipment
Highlight

Modified Water-Cooled Flue

,

Steelmaking Water-Cooled Flue

,

Essential Water-Cooled Flue

Leave a Message
Product Description

Modified water-cooled flue

 

   The main technical solution of the cooling flue is to install a cooling fin on the outer wall of the pipeline, connect the outer casing in the pipe jacket, connect the axial flow fan with an air pipe at one end of the outer casing, and set an exhaust port at the other end of the outer casing.
   The air pipe is connected with the outer casing in a inclined manner, and the outlet of the air pipe faces one end of the exhaust port installed on the outer casing. The nozzle assembly is connected on the outer casing, the nozzle in the nozzle assembly faces the cavity between the outer casing and the pipeline, and the nozzle assembly is connected with the water supply pipe by means of a nozzle.

 

Measures to prevent flue blockage:
1, the tube bundle surface of supersonic arc spraying heat, wear, erosion resistance, wear resistance of special alloy wire coating, put on the converter smoke hood "protective clothes", and according to the process conditions, develop a reasonable converter loading system, oxygen supply system, temperature system to ensure stable production at the same time, reduce the flue due to abnormal smelting methods of slag wear to the tube bundle.
2, strictly control the shape of the furnace.
3, do not use oxygen to blow into the flue, especially with metal hot slag.
4, from the manufacturing process, installation adjustment, use requirements and maintenance and other aspects, grasp every link, take targeted measures, can effectively reduce the recurrence of failure, extend the service life.

 

Cooling flue is an important equipment for converter steelmaking:

It has the function of collecting, cooling and transporting flue gas. In addition, the flue is also a waste heat boiler for the production of steam.